Luoyang Third Hospital (Henan) Medical Project(42 units )

Apr 13, 2026

Project Overview

This project is a critical infectious disease clinic construction project for Luoyang Third People's Hospital in Henan Province, China. As a professional medical building, it adopts a steel structure frame modular house system to meet the strict requirements of infection control and medical functional standards. With a total of 42 modular units and a construction area of 857.6, the two-story above-ground building was completed in only 18 days, setting a benchmark for efficient emergency medical facility construction. It effectively solves the hospital's demand for specialized infectious disease diagnosis and treatment space, while demonstrating the outstanding advantages of modular construction in medical scenarios.

Location

Luoyang City, Henan Province, ChinaAs an important medical service center in central China, Luoyang has high demands for public health emergency response capabilities. The project is located in the core medical area of Luoyang Third Hospital, which is convenient for connecting with the hospital's existing medical resources and ensuring the continuity of diagnosis and treatment services.

Scope

·  Total modular units: 42 sets

·  Construction area: 857.6 square meters

·   Building structure: steel structure frame modular house

·  Building height: 2 floors above ground

·   Construction period: 18 days

·  Core functions:• Infectious disease diagnosis rooms• Isolation observation rooms• Medical staff preparation areas• Disinfection and sterilization rooms• Medical waste temporary storage areas• Corridor with negative pressure ventilation system

Solution

We customized a professional modular solution for infectious disease clinics to meet medical standards. All modular units were prefabricated in the factory with integrated medical pipelines (water supply, drainage, electricity, ventilation) and interior decoration. The on-site assembly adopted a "fast connection" mode, completing the entire construction from foundation to delivery in 18 days. The building is equipped with a negative pressure ventilation system and anti-infection materials to prevent cross-infection, fully complying with national medical building design specifications.

Highlights

·   Ultra-fast Construction: 2-story medical building completed in 18 days, 80% faster than traditional construction.

·   Infection Control Standard: Negative pressure design + anti-corrosion materials, meeting medical anti-infection requirements.

·  High-quality Structure: Steel frame structure, earthquake-resistant, durable, with a service life of over 20 years.

·  Functional Integration: All medical pipelines pre-installed in factory, no on-site secondary construction.

·  Flexible Expansion: Modular design allows adding or reducing units according to future medical needs.

·  Green Environmental Protection: No on-site construction waste, low carbon emission, in line with eco-friendly requirements.

Client Value

· Emergency Response Support: Quickly put into use to enhance the hospital's infectious disease treatment capacity.

· Cost Savings: Short construction period reduces labor and management costs by 30% compared with traditional methods.

· Safety Compliance: Fully meets national medical building standards, eliminating safety risks.

· Improved Efficiency: Reasonable functional layout shortens the medical service process and improves work efficiency.

· Long-term Value: Durable structure and flexible expansion ensure long-term use value.

· Risk Reduction: Professional anti-infection design reduces cross-infection risks for medical staff and patients.

laissez un message

laissez un message
For any request of information or technical support, fill in the form.All fields marked with an asterisk* are required.
soumettre
CONTACTEZ-NOUS #
+86-18630605462

Maison

Produits

WhatsApp

Contactez-nous